SOLD!!!
Accommodation n.7 is a 4-room solution located on the second and last floor with living room and kitchen in the living area very bright thanks to a large sliding window that offers access to the loggia terrace.
The hallway leads to a utility room with connection for the washing machine, to the double bedroom with dedicated bathroom, to the main bathroom and to the two single bedrooms.
A loggia balcony accessible from two rooms completes the sleeping area.
ROSSINI RESIDENCE
BUILDING RESPONSIBLY TO LIVE CONSCIOUSLY
The new ROSSINI RESIDENCE will be located on Via Gioacchino Rossini at the height of Via Antonio Vivaldi, in a very quiet area and near the railway station of the Milan-Brescia line.
The project involves the construction of a building of ten apartments with high energy efficiency thanks to the following works:
High thermal insulation with EPS panels
High sound insulation (between walls and floors, between inter-storey floors and in technical shafts)
PVC windows with double glazing
Electrically operated roller shutters in insulated aluminium
Heating, cooling and domestic hot water production system centralized in heat pump, with independent management and metering for each accommodation
Radiant panels for underfloor heating and cooling that offers uniform comfort without drafts inside the rooms, does not produce noise, absorbs less energy and almost all the energy required will be fulfilled by the photovoltaic system
Controlled mechanical ventilation system
Dehumidification system
Induction system for cooking
Photovoltaic system on the roof dedicated to condominium consumption
Solar panel system on the roof for the production of domestic hot water
Preparation of the anti-intrusion system
The sale is managed directly by the builder without brokerage charges and the indicated price already includes:
Connection and stacking costs of Euro 9,000
Domatica for remote management of lights, shutters and thermostats for Euro 3,000
1.8 kWp photovoltaic system for Euro 4,000
A space will also be dedicated on the roof for the expansion of the photovoltaic system: the buyer will be able to increase, at his own expense, the potential of 2.8 kWp and reach a total of 4.6 kWp.
Single and double boxes available.
START OF WORKS JULY 2025 - DELIVERY FEBRUARY / MARCH 2027
